- Country: Czech Republic
- Summary: Rate P6501 in Km 245.044 Track Přerov - Bohumin
- CZT Ref No: 119250401
- Deadline: 28 May 2025
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: 2100000
- Notice Type: Tender
- Document Ref. No.:
- Purchaser's Detail :
Purchaser : RAILWAY ADMINISTRATION, STATE ORGANIZATION
Paved 1003/7 11000 Prague
Email :SoucekJ@spravazeleznic.cz
- Description :
- The contracting authority shall award this sub -threshold public contract for services in connection with the performance of relevant activities within the meaning of § 153 para. f) of Act No. 134/2016 Coll., on Public Procurement, as amended (hereinafter referred to as the "ZZVZ"). In accordance with Section 151 (1) of the Public Procurementsectoral public contract. Since the estimated value of the public contract does not reach the set financial limit, the contracting authority pursuant to Section 158 (1) of the Public Procurement Act is not obliged to award the sectoral contract in question in the tendering procedure. The contracting authority therefore does not enter this public contract in the tendering procedure according to the ZZVZ.The public contract is awarded according to the requirements and conditions laid down by the SM53 Directive of the Public Procurement Directive, which is the internal regulation of the contracting authority and regulates the procedures for the application of the ZVZ in the conditions of the Railway Administration, the State Organization. The subject of the VZ is the performance of occasional professional geotechnicalSupervision for construction. Requirements for the activities of occasional geotechnical supervision in the realization of geotechnical supervision will be performed occasionally, according to the needs and requirements of the client, with an emphasis on inspection of geotechnically significant works and compliance of the construction with project documentation, the results of the engineering-geologicalsurvey and valid technical standards. The fulfillment will include the final report of the GT supervisory report on the monitored section of the construction and cooperation in the final opinion of the investor for accepting work, including consulting activities according to the client's requirements. The Contractor shall perform the work in accordance with the validTechnical standards, railway regulations and technical ...
- Documents :
Tender Notice
83dc3a5d849df872a01f8da676c10f7d.p6501.prerov.bohumin_zd.zip
20f65c2c19f6e61303d2e808cb030892.nahrada.prejezdu.p6501.pdps.zip.001
93feb13fbebcd291b34cf0a16bb7a871.nahrada.prejezdu.p6501.pdps.zip.002
d3a73a5344739920d359fda54ad333aa.nahrada.prejezdu.p6501.pdps.zip.003
1adfc941e1f3abbf89620063d0e1e2fd.nahrada.prejezdu.p6501.pdps.zip.004
993706e28bf5de75af9647a26c9637bb.pokyn.komprimace.ps.docx
5d61d986740c7b50b100b3246a200815.tkp_komplet_2024_06_14.zip