cable

CzechiaTenders provides latest updates on cable tenders from Czechia. The information is collected from various sources like: Purchaser's websites, News papers and other Czechia Government Tenders sites. Subscriber can view and download unlimited number of cable Tenders.

(nature and quantity of works, supplies or services or indication of the relevant needs and requirements; only in the case of supplies - indicate whether offers are requested relating to purchase, rent, lease, installment sale or a combination of these options) The subject of the performance of the public contract is the demolition of parts of the trackŽST Praha-Smichov, the district of the common station and selected remaining tracks of the district of the passenger station. The existing steel footbridge in km 0.255 will be demolished, including lighting, the traction line will also be demolished, the traction masts and gates of the traction line of the track of the perimeter of the common depot will be dismantledlives. In addition, the cables of the power line from the substation, which are located at the common station, will be repositioned, and public lighting will be adjusted at the same time. At the point of interruption of SK No. 6, a temporary platform with a length of 100 m will be built at SK No. 8. A security device will also be adjusted, which wille affected by the demolition of the traffic office at the site of the existing footbridge. A more detailed specification of the subject of the public contract is provided in other parts of the procurement documentation.tracks of the passenger station circuit. The existing steel footbridge in km 0.255 will be demolished, including lighting, the traction line will also be demolished, the traction masts and the gates of the traction line of the track of the perimeter of the common station will be dismantled. Furthermore, the cables of the power line from the substations will be repositionede, which are located at the common station, public lighting will be adjusted at the same time. At the point of interruption of SK No. 6, a 100 m long temporary platform will be built at SK No. 8. Security equipment will also be modified, which will be affected by the demolition of the traffic office at the site of the existing footbridge forpedestrians. A more detailed specification of the subject of public procurement is provided in other parts of the procurement documentation.

CZT Ref No.:  76707534

Deadline:  27 Jan 2023

(nature and quantity of works, supplies or services or indication of relevant needs and requirements) The subject of the public contract is the design and implementation of a data communication network in the new headquarters of the office and the subsequent service provision of its operation. The subject of the contract consists of the following sub-groups of activities) Developedi technical implementation documentation (TRD) containing a comprehensive design of the concept and implementation of the LAN network environment. The TRD will be developed on the basis of a detailed analysis of the environment, including the simulation of wireless communication signal propagation, and implementation work will be carried out according to it.b) Complete implementation (installatione, configuration, testing, etc.) of the LAN network environment according to technical implementation documentation 1) Physical installation of wireless connection access elements (WiFi AP) and their cable connection to access switches; connection of cables for mutual interconnection of active elements in technological cabinets.2)Configuration of all active elements and all components of the wireless connection incl. test sensors. 3) Installation and configuration of the Cisco DNA Center (DNAC) network management and monitoring tool. 4) Implementation of authentication according to the IEEE 802.1x standard, installation and configuration of the Cisco IdentityServices Engine (ISE) as an authentication server, configuration of access elements, etc. 5) Sample deployment of the analysis tool Thousand Eyes (TEs) on workstations, including its implementation solution for repeated distribution via image or SCCM.echnology) regarding the operational settings for and SW tools of DNAC, ISE, TEs within 24 hours. 7) Creation of complete operational documentation and update of TRD-implementation documentation with a record of changes that occurred during the implementation. c) Provision of service support for the implemented solution for a fixed period until31. 3. 2028.d) Consultation and other work beyond the scope of service support in the scope of a maximum of 50 hours in one (1) year. The exact specification of the subject of the public contract can be found in Part D of the Technical Terms of Tender...

CZT Ref No.:  76629581

Deadline:  27 Jan 2023

  Chat with us